Project and Program Management
Mark Henry, Inc. applies intensive and diversified project and program management knowledge, principles, and practices to a broad area of assignments undertaken to create a unique product or service critical to the realization of each client's business strategy. To ensure success, Mark Henry, Inc. applies experience, knowledge, skills, tools, and techniques to creatively adapt the project or program initiating, planning, executing, controlling, and closing-out process to each client’s specific needs.
The demonstrated creativity, foresight, and mature project management judgment in managing the competing demands of (a) requirements, risk, and scope, (b) stakeholder needs and expectations, and (c) project metrics of time, cost, and quality enables Mark Henry, Inc. to make decisions, outline recommendations, and provide guidance that ensures the fulfillment of the client's project or program objectives.
Successful projects and programs benefiting from the unique brand of holistic and forward-thinking management techniques offered by Mark Henry, Inc. include:
- Active pharmaceutical ingredient (API) powder and semi-liquid bulk receiving and storage installation
- Automated equipment washing equipment
- Automatic guided vehicle (AGV) installation
- Bulk bag unloading system
- Bottle cleaner installations
- Bottle unloading equipment installation
- Calcium carbonate new refining and grinding operations installation
- Cartoning equipment installations
- Chocolate processing (receiving, storage, manufacturing, and distribution)
- Container crane renovations (control systems, drives, generators, motors)
- Conveyor system (floor, overhead) installation
- Disposable bag filling and unloading system installation
- Disposable bioreactor replacement
- Equipment elevator installation
- Freezer (reach-in, walk-in, drive-in) new installations
- Liquid filler refurbishment
- Load cell (tanks, floor scales) and control system replacement
- On-machine drying (infrared, gas, steam) new installations
- Paper winder new installations and renovations
- Paper machine new installations and renovations
- Peanut processing (receiving, storage, inspection, and distribution) system
- Pharmaceutical liquid process and packaging suite renovation
- Pharmaceutical solid processing and packaging suite renovation
- Roto granulator installations
- Stability chamber (reach-in, walk-in) new installations
- Steel bloom drag transfer control and drives upgrade
- Tandem coater new installation
- Ampicillin/sulbactam vial filling
- Children’s antacid product launch
- Liquid antacid line extensions (flavors)
- Liquid antacid line extensions (bottle sizes)
- Small molecule scale-up and manufacturing integration
- Solid antacid line extension (tablet count, packaging)
- Solid antacid product launch (tablet, packaging)
- Vaccine process scale-up and manufacturing integration
- Vaccine vial and syringe filling
- Electrical plan review (commercial, industrial, and retail establishments, education facilities, food handling and preparation facilities, oncology facility, retirement facilities, sports complexes, medical clinics, place of worship, records retention, single and multi-family dwellings, warehouses)
- Laboratory instrument relocation
- Qualification (computer systems, equipment) master plan development, protocol development, protocol execution, deviation handling, and closeout
- Regulatory filings (CBEs, master records)
- Regulatory inspection interface
- Standard operating procedure development
- Validation (process, cleaning) master plan development, protocol development, protocol execution, deviation handling, and closeout
- Y2K remediation and preparedness
- Electrical services (industrial, commercial, residential)
- Emergency generation (diesel) and distribution systems
- Emergency lighting and means of egress systems
- Exterior lighting (parking, security, decorative)
- Infrastructure lightning protection
- Integrated substation installation (primary switch, transformer, switchgear)
- Interior lighting (laboratory, office, warehouse, manufacturing, detail task)
- Lighting panel installations
- Load analysis and redistribution
- Motor, drive, and feeder replacement (calenders, compressors, HVAC, paper machines, pumps, specialty equipment, winders, etc.)
- Power panel installations
- Stand-by power systems (natural gas generation, transfer switches, load re-distribution)
- Switchgear installations (interior and exterior)
- System and specialty grounding
- System fault calculations
- System coordination studies
- Transformer bushing replacement
- Transformer installation (isolation, lighting, power)
- Transformer PCB remediation
- Boiler conversion (oil to natural gas)
- Hot water boiler installation
- Hot water piping insulation replacement
- Mill/plant steam expansion
- Sanitary waste pumping station
- Steam piping insulation replacement
- Wastewater treatment facility expansion
- Wastewater process control system upgrade
- Clean room (electronic and pharmaceutical) new construction
- Containment hood (fume, laminar flow, bio-safety) installations
- Laboratory (analytical chemistry, equipment testing, microbiological, and pharmaceutical development) new construction and renovations
- Maintenance shop expansion
- Modular room fabrication and installation (control rooms, motor control centers, and switchgear)
- Multi-stage pump testing facility
- Office space expansions and renovations
- Parts storage relocation and automation
- Site relamping (office, warehouse, parking, perimeter)
- Wind tunnel testing facility
- System balancing (clean rooms, laboratories, manufacturing suites, offices)
- Efficiency upgrades (condenser compressors, fan motors, and drive units)
- Upgrade analytical chemistry and microbiological laboratory systems
- Unit installation for new analytical chemistry and microbiological laboratory construction
- Deionized water (DI) new generation and storage installation
- Deionized water (DI) distribution system expansion
- Facility water main installation
- In-line total organic carbon (TOC) monitoring installation
- In-line conductivity monitoring installation
- Ozonization system replacement
- Point-of-use instant hot water heaters
- Pre-treatment new system installation
- Pre-treatment existing system upgrades and replacements
- Reverse Osmosis (RO) new system installation
- Reveres Osmosis (RO) membrane replacement
- Water for injection (WFI) new distillation still installations
- Water for injection (WFI) distillation still relocation
- Water for injection (WFI) new storage and distribution installations
- Ultra-filtration (UF) installation
- Clean-in-place (CIP) existing system expansions and renovations
- Clean-in-place (CIP) new system installations
- Clean-steam (CS) new generation and distribution systems
- Compressed air (generation, storage, distribution)
- Compressed air point of use filtration
- Point-of-use cooling stations on hot water for injection (WFI) stations
- Steam-in-place (SIP) existing system renovations
- Line-shaft drive replacement (steam turbine to AC motor)